Installation method and precautions of aluminum veneer
Nowadays, the application of aluminum plate in the living industry is more and more extensive, so what are the requirements for the installation of aluminum veneer/wood grain aluminum veneer/aluminum veneer ceiling series? Let's talk about the installation methods and precautions of aluminum veneer/wood grain aluminum veneer/aluminum veneer ceiling series.1. Installation method
1. Draw the horizontal line according to the required level, and draw it in both vertical and horizontal directions;
2. Hoist light steel keels (38 or 50 keels) at appropriate intervals, generally 1-1.2 meters apart, and the distance of the booms shall be distributed according to the regulations of light steel keels;
3. You must wear gloves when installing Fangtong. If you leave fingerprints or stains accidentally, you can wash it with detergent and wipe it dry;
4. Install the hanging parts pre-installed on the keel, together with the square keel under the light steel keel. The distance between the square keel is generally 1 meter, and it must be adjusted to the level after all installation;
5. Hang the aluminum veneer/wood grain aluminum veneer/aluminum veneer ceiling series on the keel in order, and then press down the inverted lock piece. The square end should be kept at a distance of 0mm or 20mm.
2. Main matters needing attention in aluminum veneer installation:
1. Handle with care when transporting. After a strong impact, the corners and layout of the aluminum veneer will be damaged, which will affect the construction and waste money.
2. Pay attention to the protection of the board surface during the installation of aluminum veneer. Do not touch the ground with the board surface to avoid scratching the decorative surface.
3. The variety, quality, color, pattern and line of aluminum veneer should meet the design requirements, and there should be a product certificate.
4. If the frame of the curtain wall adopts profiled steel keel, its specifications and shape should meet the design requirements, and should be treated with rust removal and antirust.
5. Aluminum veneer installation, when the design has no special requirements, it is best to use cored aluminum rivets, and a rubber ring must be inserted in the middle. The distance between blind rivets should be controlled within 100-150mm.
6. After the aluminum veneer is installed, pay attention to tear off the protective film after 3 days. It will be difficult to tear off after too long, and it will affect the appearance after tearing off.